This project in Mount Keira required the demolition of a large railway sleeper retaining wall
and a monster excavation of over 160 tonne of material, using all of our machines and trucks.
We brought this young family's backyard to life with the construction of a 2.1m high
fully engineered Dincel retaining wall, accompanied with 2 large sets of formed and
poured concrete stairs, with concrete over 100sqm of the backyard in total.
A fence was added to the top of the wall, along with a bush rock retaining wall at the top of the backyard
and finished with a new layer of turf.